dinsdag 29 december 2015

What will run on the layout?

Today worked out the consists I will run the first show. That one is planned end of October 2016. Made lists earlier (2 years ago) so I have a pretty good idea what I could do. Main focus will be the 80's with 4 and 6-axle SP power with a occasional UP:


My wife experimented with sisal rope as part of making trees for the layout. More about that later:


maandag 28 december 2015

More benchwork

Middle of the center pieces:


The place where the center plates will be:


Measuring up:


Too low!:



Filling up with a thin piece plywood:



And spiked and glued:


Level!:


The middle center piece:


Hole for lining it up:


Spiking:


Gluing:


Second batch:


Build:



Lining both sides up:


And both pieces ready and drying:


Preparing more circle pieces:



Dry:


Both seperate pieces:


More to come!

zaterdag 26 december 2015

Started benchwork.

Start building the two head ends of the layout modules (halves).

Start gluing:


Dryed:


Cut to fit:


Bolted together. Clamps are temporarely:


donderdag 24 december 2015

woensdag 23 december 2015

Redesign

Did some redesign this morning. This way I have only 2 staging tracks but with very long capacity. The first will be 5 meters, the second 4,5. It should fit the overall look better.

Drawing in the living room:



The new design:


In detail:



More to come!

maandag 21 december 2015