Blog about building a home layout in H0 that has the Southern Pacific as example.
Timeframe will be around 1980 to 2000, the period of the sell-out to the Union Pacific.
zaterdag 30 april 2016
First bridge has arrived!
Hi all,
The swing bridge kit has arrived today:
A lot of parts!:
The other two will be ordered this coming week. This kit will be modified to one track instead of two. A lot of work to be done!
Geen opmerkingen:
Een reactie posten