The first crossbrace:
All 3 in place, testfitting the legs:
First leg glued on:
And with both:
The floorboard that is with the bridge. It has to be shortened according to the photo:
Shortened:
And testfitted with the top together on the bridge:
This is what is provided for the electric wire that is necessary to power the lights on the bridge:
I will not use that and try to find the thinnest wire possible.
More to come!
Geen opmerkingen:
Een reactie posten