woensdag 20 januari 2016

Signal bridge part 2

This morning I went on with the bridge. This is my work space:


The first crossbrace:


All 3 in place, testfitting the legs:


First leg glued on:


And with both:


The floorboard that is with the bridge. It has to be shortened according to the photo:


Shortened:


And testfitted with the top together on the bridge:


This is what is provided for the electric wire that is necessary to power the lights on the bridge:


I will not use that and try to find the thinnest wire possible.

More to come!

Geen opmerkingen:

Een reactie posten