More to come!
Blog about building a home layout in H0 that has the Southern Pacific as example. Timeframe will be around 1980 to 2000, the period of the sell-out to the Union Pacific. The modeled line will be the Cascade line.
zondag 31 januari 2016
woensdag 20 januari 2016
Signal bridge part 2
This morning I went on with the bridge. This is my work space:
The first crossbrace:
All 3 in place, testfitting the legs:
First leg glued on:
And with both:
The floorboard that is with the bridge. It has to be shortened according to the photo:
Shortened:
And testfitted with the top together on the bridge:
This is what is provided for the electric wire that is necessary to power the lights on the bridge:
I will not use that and try to find the thinnest wire possible.
More to come!
dinsdag 19 januari 2016
Building the Summit signal bridge
I started the signal bridge today. Modified it to look more like the one on Cascade Summit:
Started with a IHC kit:
The IHC one has to little girders in it. Also the prototype has a cross in the middle, due to the construction of the IHC kit I made two crosses in the middle.
The photos with the sprue's:
Made some extra girders to look like the prototype:
First side finished:
And with the second one:
More to come!
zondag 3 januari 2016
Decoders
Have some older DCC decoders, printed there descriptions so that I can experiment with them for the coming days:
This!
This is what I am seeking in this layout, the typical SP operations in the mountains:
Photos are from: http://spcascades.railfan.net/
dinsdag 29 december 2015
What will run on the layout?
Today worked out the consists I will run the first show. That one is planned end of October 2016. Made lists earlier (2 years ago) so I have a pretty good idea what I could do. Main focus will be the 80's with 4 and 6-axle SP power with a occasional UP:
My wife experimented with sisal rope as part of making trees for the layout. More about that later:
maandag 28 december 2015
More benchwork
Middle of the center pieces:
The place where the center plates will be:
Measuring up:
Too low!:
Filling up with a thin piece plywood:
And spiked and glued:
Level!:
The middle center piece:
Hole for lining it up:
Spiking:
Gluing:
Second batch:
Build:
Lining both sides up:
And both pieces ready and drying:
Preparing more circle pieces:
Dry:
Both seperate pieces:
More to come!
Abonneren op:
Posts (Atom)












































